Nov 22, 2011 #1 no1riggie Technical User Joined Nov 22, 2011 Messages 1 Location GB Our workplace closes over the holidays and we need to stop backups from 26th December to 4th January. Is there a way to do this?
Our workplace closes over the holidays and we need to stop backups from 26th December to 4th January. Is there a way to do this?
Dec 5, 2011 #2 FaiTHLeSS Technical User Joined Jun 30, 2002 Messages 805 Location GB In commvault concole goto control panel, then there should be an option called set holidays. No scheduled tasks will be run during a holiday period Upvote 0 Downvote
In commvault concole goto control panel, then there should be an option called set holidays. No scheduled tasks will be run during a holiday period