What seems to be happening is:
I set up one group to back up areas c and D. When i assign these areas to the group I schedule it to run today at 14:00hrs, for example
Once that has been set i assign area E and system state to the secnond group. Go intot he schedule tab and set it to also run at 14:00hrs.
Whatever the second group has been set to, the first group becomes set to the same jobs! even though I have set the first group up to back up a different area!
I'm very confused. Why is the back up job of my first group changing to whatever my second group is set to????