Hi All,
I was wondering if any one could help with direction or suggestions.
Our legato backup server is W2k Server/DC. We are planning to rebuild the server with Win2k3. This server is attached to our backup library via scsi controller.
How should I go about it?
If I start wiping the server, and reinstall the O/S, patch, etc, than Networker, will that recognize the existing backup jobs in the library?
Is there something that I need to backup, and restore later?
Your suggestions are very appriciated.
Thanks.