Has anyone ever set one of these up? I've been asked by managment to decide on a plan for this. It's for a bearing plant with about 64 PCs, of which maybe 20 of the shop floor PCs are ~75Mhz w/16M and 1G hdd's. They want the following two objectives met:
A. Formulate plan to continually upgrade all plant PC's, printers and misc. hardware
B. Recommend replacement scenario(s) with timing and cost
I have no idea on where to start with this. I was looking at also possibly putting Thin clients on the shop floor which would help with the greese/dirt problem out there too. Anyone have any tips from experience? A starting point... anything? Thanks!
Darrell Mozingo
A. Formulate plan to continually upgrade all plant PC's, printers and misc. hardware
B. Recommend replacement scenario(s) with timing and cost
I have no idea on where to start with this. I was looking at also possibly putting Thin clients on the shop floor which would help with the greese/dirt problem out there too. Anyone have any tips from experience? A starting point... anything? Thanks!
Darrell Mozingo