I do a FULL of my clients once a week on differing days and INCR for the rest of the days.
Any suggestions on how best to detect (via a script) that the scheduled FULL backup failed and it will then force the next scheduled backup of the failed client to be a FULL instead of an INCR?
This situation popped up during a disaster recovery drill - we were unable to recover a couple of systems due to a botched FULL backup (a network problem) that occured without discovery/repair.
Thanks!
Any suggestions on how best to detect (via a script) that the scheduled FULL backup failed and it will then force the next scheduled backup of the failed client to be a FULL instead of an INCR?
This situation popped up during a disaster recovery drill - we were unable to recover a couple of systems due to a botched FULL backup (a network problem) that occured without discovery/repair.
Thanks!