I currently have 2 servers installed with Exchange 5.5 Standard Edition. Currently I am on the edge to start installing a new server with W2K3 and E2K3. How do I go about a migration from these 2 servers to the new W2K3, and then phasing out the 5.5 Servers but leaving one as the primary domain controller ?