thanks for the reply.
I have SMTP configured and I do get an email on job completion , which includes the job log, but does not include info on which tapes were used in the backup job.
There seems to be something which may prove useful in Report option within Arcserve which I'm looking at now.
I come from an HP Data Protector background and things that were easily configured within DP are difficult / not even available within Arcserve - hey hum !!