I am a novice when it comes to tape backups so...
I have a Windows 2003 server, ARCserv 11.1 and a Quantum Superloader with two magzines which hold 8 DLT tapes each. At the moment I am backing up a third of the HD to each of 3 tapes which I label individually. In otherwords, I currently have 15 different backup jobs scheduled. i.e. 3 Mondays, 3 Tuesdays... All the tapes reside in a Group 0. Is there a way that I can set up these 3 tapes to backup the whole server with one job. i.e. once one tape is full it moves to the next tape in the group, etc. Our company likes to do full backups Monday to Thursday, then we do Friday 1,2,3, & 4 and then Months 1,2,etc.
TIA - yooper46
I have a Windows 2003 server, ARCserv 11.1 and a Quantum Superloader with two magzines which hold 8 DLT tapes each. At the moment I am backing up a third of the HD to each of 3 tapes which I label individually. In otherwords, I currently have 15 different backup jobs scheduled. i.e. 3 Mondays, 3 Tuesdays... All the tapes reside in a Group 0. Is there a way that I can set up these 3 tapes to backup the whole server with one job. i.e. once one tape is full it moves to the next tape in the group, etc. Our company likes to do full backups Monday to Thursday, then we do Friday 1,2,3, & 4 and then Months 1,2,etc.
TIA - yooper46