I mofified a job on Friday to run a failed job at 10.00 AM on friday morning. Then I forgot to change the schedule back to 23.59 PM after the job finished so that it would run as normal. So when I can in today, it was running again at 10.00 AM. Once the job finished, I changed the schedule back, but now it says the next run time is tomorrow at 23.59 when it should be tonight as the backup that was done this morning was Friday night's backup. I've tried messing around with the schedule as much a I can but it still insists that the next backup is tomorrow night. Can anybody help me out at all?