Hi,
I have a W2KServer with backup of windows. I have scheduler tasks, but the information is greater than the capatibility of the deck. The system ask me put another tape, but don't work.
How can I scheduler with Backup Windows for than use two tapes or decks? When a tape finish put anotther and than the job continue.
Thanks.
I have a W2KServer with backup of windows. I have scheduler tasks, but the information is greater than the capatibility of the deck. The system ask me put another tape, but don't work.
How can I scheduler with Backup Windows for than use two tapes or decks? When a tape finish put anotther and than the job continue.
Thanks.