Hello,
Here is present Exchange 5.5/AD environment:
We have two W2K3 child domains. We're going to be installing an Exchange 2003 cluster into child domain A. For security reasons, this 2nd child domain had to be created. Everyones mailbox is going to live on the cluster in domain A. There are two sepearte NT 4.0 resource domains where the 5.5 servers reside now, but once the mailboxes are moved to the cluster, those domains will be history.
We're trying to plan our ADC deployment. I've never had to set the ADC up where more than one domain was in place. How would I set this up? All servers are in a centralized location. We have two 5.5 sites right now, but that will be dropped to a singled Admin group where the cluster will reside. Do I need and ADC server in both child domains?
Thanks
Here is present Exchange 5.5/AD environment:
We have two W2K3 child domains. We're going to be installing an Exchange 2003 cluster into child domain A. For security reasons, this 2nd child domain had to be created. Everyones mailbox is going to live on the cluster in domain A. There are two sepearte NT 4.0 resource domains where the 5.5 servers reside now, but once the mailboxes are moved to the cluster, those domains will be history.
We're trying to plan our ADC deployment. I've never had to set the ADC up where more than one domain was in place. How would I set this up? All servers are in a centralized location. We have two 5.5 sites right now, but that will be dropped to a singled Admin group where the cluster will reside. Do I need and ADC server in both child domains?
Thanks