Well, being that I am all the staff that would be getting up to do work above the ceiling, I'm not sure the permit thing would do too much. And contractors all get out here on bid projects, and those get inspected by myself as well as the formal construction inspector (and our new one is GOOD!).
Right now we're having a hard enough time getting Facilities to tell us when they've approved some one else to dig on campus. We've lost one conduit (fortunately an empty one) and had two close calls without any notification that people were digging. The other place we have problems is cubical re-alignments. We usually don't know about those until the user submitts a work order after the fact to have their PC plugged into a data jack that no longer exists.
Anyway, I'm curious, would you be doing the inspection on these permits? Or would the facilitise people be doing the inspection?
Justin T. Clausen
Physical Layer Implementation
California State University, Monterey Bay