I have just had Crystal Reports 10 installed on my PC.
When I start a new report and select the Add New Connection, the Oracle Server selection is not there.
Can someone help me identify what may have gone wrong or how to get this selection to show?
Thanks,
Ray
Using Project 2007.
I have 10 Tasks to perform.
The last task is really the Project and I am trying to reverse schedule the tasks prior to the last to see when the the lastest date is the preliminary work can start.
I want to see this in the calendar with the last task being Day 1 (or Day 0...
Using CR10.
I have a field which contains Item Numbers.
At some point, item numbers were entered with a ^ preceeding the actual Item Number.
How can I create a formula that will remove the ^ from the beginning of an item number (only if there is one) and giving me the remainder of the string...
Using CR10.
I am trying to create a Report that will show the Daily Burn Rates for individual work orders so I can group by the Dates to get a Daily Burn Rate for Each date represented by all the work orders.
For Example:
WORK ORDER TOTAL HRS START DATE FIN DATE DUR HRS PER DAY
WO...
Crystal Reports 10.0
When Crystal Reports Groups, the Group Title is shown on the left hand side for easier drill down.
Can the description of these titles be changed?
Example:
I have work flow grouped using a sort sequence number so I have control within may database on how the work flow is...
Using CR 10
I am using this formula to calculate the Predictated Finish date of a Task.
if {Command.WO_DUE_DATE} < currentdate
then
currentdate + {@Flow Days Remaining (new)}
else
{Command.WO_DUE_DATE}
I continue to recieve the error "The number of days is out of range". Nothing I have...
Using Project 2010.
When I select a filter all the filter items turn blue.
Is there a way to make the filter work like a filter and hide everything that is not part of the filter?
Thanks,
Ray
Using CE10
I am not familiar with creating Queries in Query Builder and need help with the SQL.
I am trying to query the date and time when a report was last run (SI_LAST_RUN_TIME Property).
With this information I would like to bring back the Folder (and or Subfolder where the report was run...
Using Projects 2010.
When the tasks under a summary task are 100% complete, the summary stays at 99%.
This is happening for all summary tasks.
Can this be corrected?
Thanks,
Ray
Using CR 10.0
I have a field with part numbers of various lengths.
Some of the Part numbers end with -EA.
I need to be able to remove the -EA from those that have it and leave the remaining part number.
Examples:
Field contains;
12345
1467
5678-EA
89-EA
Result should look like;
12345
1467...
I use MS Projects 2007.
I have a requirement to send my Projects Files in Projects 2003 format. (this is not an issue)
I have data within my Project files that I do not want to be visible when I send my files nor do I want the reciever to be able to access certain columns. This data is needed...
I use MS Projects 2007.
I have a requirement to send my Projects Files in Projects 2003 format. (this is not an issue)
I have data within my Project files that I do not want to be visible when I send my files nor do I want the reciever to be able to access certain columns. This data is needed...
Using CR 10.0
I have a report (AVG DAYS) that calculates the Avg Start Day, and the Avg Flow Days for a Work card that has multiple repeats.
The report is grouped by the WORK_CARD so only the Work Card number, Avg Start Day, and Avg Flow Days is shown.
I have another report (WO PLAN) that has...
Using CR 10.0
I have Work Orders that have other work orders assigne to them. The original work order would be the "Parent" the others would be the "Child" orders.
The "Parent" has an association to the customer number in a field "CUST_NO" the Child orders do not.
Is there a way to create a...
Is it possible to Schedule reports from Excel using Enterprise?
I have an Excel file that I would like to schedule to email addresses.
I am using Enterprise 10.0
Thanks,
Ray
Using CR10
I have a list of Work Orders that are Grouped by a controlling Work Order.
Work Order Controlling Date Started (Grouped by 111)
215G01 111 10/8/2010
215G02 111 10/8/2010
215G02 111
215G02 111
Work Order Controlling...
I recieve the following error when playing games at POGO.com.
The computer is used almost exclusivly for POGO so I am not sure if it would occur at other times.
Anyone know why this occurs and/or if it can be fixed?
Thanks,
Ray
THE ERROR:
#
# A fatal error has been detected by the Java...
Using Excel 2007.
Saving File as Excel 2003.
I have a spreadsheet that when a field is entered, the data in another field is populated from data linked to the spreadsheet.
The field where the data is has the wrap text enabled but the row height does not adjust for the wrapped text when the...
Using Project 2007.
Is there a way to Sort just a selection?
When I use the sort feature, everything sorts.
All I want to do is sort one summary tasks contents.
Thanks,
Ray