Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations bkrike on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: jdblank
  • Content: Threads
  • Order by date
  1. jdblank

    MS - Forecast Consumption View

    Progression 7.6.100a - MS SQL Hello all: We're seeing some strange records in the MS Forecast Consumption View. We drill down on our current period to see current demand orders, and we are getting Order Types = 'XXX' with order numbers from out of nowhere and no customer numbers. I checked OE...
  2. jdblank

    iminvtrx question

    Can someone please point in the right direction? looking for where iminvtrx.ctl_no for source = 'S' records come from. Thanks.
  3. jdblank

    Need Help - MCA Trx

    7.6.100a MS-SQL We have pretty hosed up SO/Job. I have transactions in MCTRXFIL which is spitting out the "No crew records on file" message. For some reason, the MCFIXCRW.INT is not fixing the records for Job. If anyone out there knows what MXFIXCRW.INT is doing so we can back door it, much...
  4. jdblank

    Work Around - OE/MFG

    Hello: Looking for work around. Need to plan and produce (SFC) new items, at the same time prevent OE from entering same new Items against OE orders. Need a flag that makes parent item active in mfg, but prevents entering for shipment. Unfortunately, our WMS isn't driven by OE Line dates, when...
  5. jdblank

    Forecast Consumption

    Progression 7.6.100a 99% of the time forecast consumption works well for us out of the box – it consumes this periods forecast and stops consuming when forecast is exhausted in the current period (monthly) – in other words, it doesn’t consume future periods. However, we have an exception on...
  6. jdblank

    Setup Operation - Labor Costs-LT

    Not sure if this is design, or bug…. I have 2 workers doing Setup Operation. It takes 2 workers –3 hours consuming machine (6 total labor hours) to complete the setup. On oper detail, # of employees is 2; if I load 6 Labor hours it costs right but doubles my MRP Lead Time. If I load 3 hours...
  7. jdblank

    Mac Item Revision/ECN

    hello: anyone know where i can find an enhancement (that already exists with interface to macola) that helps manage item revisions/ecn's. thanks.

Part and Inventory Search

Back
Top