For a column chart type in Excel 2010, I have quaitity as values for the Y axis and for the X axis, I have Month as one category and Priority as a second category.
The Priority label is not the primary category and I am unable to align this vertically.
So the chart is just counting the...
You can change the alignment of axis labels on both horizontal (category) and vertical (value) axes.
But when you have multiple-level category labels in your chart, you can only change the alignment of one level of labels.
How can you change the alignment of them all. Help!
You can use a custom pipeline and the Flat File Disassembler component where messages are parsed using header, trailer, and body schemas.
Use the Flat File Schema Wizard to create schemas.
Stew
FYI
I found the Pipeline Component Wizard written (by Martijn Hoogendoorn) excellent:
http://www.gotdotnet.com/Workspaces/Workspace.aspx?id=1d4f7d6b-7d27-4f05-a8ee-48cfcd5abf4a
"If you expect to receive different flat file documents on the same receive location, you typically include several flat file disassemblers in the receive pipeline, one for each schema"
This is mentioned in the SDK (for the schema resolver). Does anyone have a sample implementing the IProbe...
Hi
I'm using the BeforeUpdate event to validate data (catch nulls). This works fine unless a user happens to enter data and then delete it. Error 2108 generated.
Can someone explain what is happening?
Thanks in advance
Stewart
--------------------
Private Sub txtControl_BeforeUpdate(Cancel...
Hi
I have a page that contains a OWC chart and pivot table that pulls data from MS SQL using a stored procedure that works correctly on most machines.
On some machine it generates an error:
The PivotTable list "PivotTable" could not connect to the data source "". For information...
Hi Hamzagm
This seems like an overkill to me.
Access has the escape button which (in effect) performs these operations (hit once|twice to undo field|record changes).
If this really doesn't suffice, look into RunCommand|Undo in macros.
If you want to be really professional - look into...
Hi
KenReay - it really is that simple. I would never hope to start from scratch and develop an entire ERP/MRP/??P system.
From 3 different raw materials we can produce a set number of products in a set number of production stages. For the traceability issue - all information was going to be...
Hi Ed
You’re one step ahead of me.
I suspected that something like DirectParallel cable access or a serial converter would be fine (I have never had to do this before). The world of cabling looks like a bit of a nightmare - but I will check it out.
Once I get that far I will quiz you on the...
I have an old machine (1983) which is just a box that spits out a printout everyday.
I want to capture the data that is sent and store this as a file on a 'normal' computer.
Is there any way I can connect this old machine using the printer cable?
Thanks for any help in advance.
Stew
Hi Ken
Thanks for the reply - it sounds as though you have done this kind of thing before.
To answer your question, I think the answer is: Quantities will be processed in batches that need to be tracked.
To give an example:
The raw material A (of quantity x) will be processed into 3 final...
Hi All
My case is quite simple. Raw material is turned into a finished product. This could then be stored (or not) and at a later date (or the same day) be processed into a further finished products. The db will have to describe the entire production path and packaging and finally show stocks...
Hi Sorrells
Thanks for the speedy reply. I really do know what you mean about the dearth of information on internationalisation issues. Tempted to move to Java yet?
I found a suitable solution for my problem - although far from perfect. Simply by changing the settings in Windows XP...
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.